1. | A Robust credibility-based fuzzy programming for supply chain optimization in lean manufacturing environment | |
صفحه 1-16 | ||
Masoud Rabbani؛ Farzad Mehrpour؛ Amir Farshbaf-Geranmayeh | ||
2. | Monitoring Lognormal Reliability Data in a Two-Stage Process Using Accelerated Failure Time Model | |
صفحه 17-26 | ||
Azam Goodarzi؛ Amirhossein Amiri | ||
3. | New Formulation and Solution in PCB Assembly Systems with Parallel Batch processors | |
صفحه 27-46 | ||
iman rastgar؛ rashed sahraeian | ||
4. | Scheduling a constellation of agile earth observation satellites with preemption | |
صفحه 47-64 | ||
Saeed Hosseinabadi؛ Mohammad Ranjbar؛ Sepehr Ramyar؛ Masoud Amel-Monirian | ||
5. | A new approach in graph- based integrated production and distribution scheduling for perishable products | |
صفحه 65-76 | ||
fateme marandi | ||
6. | Improving for Drum_Buffer_Rope material flow management with attention to second bottlenecks and free goods in a job shop environment | |
صفحه 77-88 | ||
Fahimeh Tanhaie؛ Nasim Nahavandi؛ Sayyid Dawood Ahmadi Motlagh | ||