Improving for Drum_Buffer_Rope material flow management with attention to second bottlenecks and free goods in a job shop environment | ||
Journal of Quality Engineering and Production Optimization | ||
مقاله 6، دوره 2، شماره 1، شهریور 2017، صفحه 77-88 اصل مقاله (681.48 K) | ||
نوع مقاله: Research Paper | ||
شناسه دیجیتال (DOI): 10.22070/jqepo.2017.1081.1032 | ||
نویسندگان | ||
Fahimeh Tanhaie* 1؛ Nasim Nahavandi2؛ Sayyid Dawood Ahmadi Motlagh3 | ||
1University of Tehran | ||
2Tarbiat Modares University | ||
3Isfahan University of Technology | ||
چکیده | ||
Drum–Buffer–Rope is a theory of constraints production planning methodology that operates by developing a schedule for the system’s first bottleneck. The first bottleneck is the bottleneck with the highest utilization. In the theory of constraints, any job that is not processed at the first bottleneck is referred to as a free good. Free goods do not use capacity at the first bottleneck, so very little attention is given to them in the Drum–Buffer–Rope literature. The objective of this paper is to present a methodology that improves the Drum–Buffer–Rope material flow management with attention to the second bottleneck and free goods. This paper presents a comparative analysis of Drum–Buffer–Rope material flow management and the proposed methodology in a job shop environment. To study the impact of free goods and the second bottleneck on the performance of the DBR method, 18 job shop simulation models were developed and data analysis was done for each simulation model. Lead time and throughput are the system performance measurement output parameters. The simulation result shows that the proposed methodology significantly improved the lead time and throughput. | ||
کلیدواژهها | ||
Drum–Buffer–Rope؛ Theory of constraints؛ Free goods؛ Bottleneck | ||
مراجع | ||
Babu, T., Rao, K., & Maheshwaran, C. (2006). Application of TOC embedded ILP for increasing throughput of production lines. The International Journal Of Advanced Manufacturing Technology, 33(7-8), 812-818. http://dx.doi.org/10.1007/s00170-006-0508-4 Betterton, C., & Cox, J. (2009). Espoused drum-buffer-rope flow control in serial lines: A comparative study of simulation models. International Journal of Production Economics, 117(1), 66-79. http://dx.doi.org/10.1016/j.ijpe.2008.08.050 Bozzone, V. (2001). , The theory of delays a tool for improving performance and profitability in jobshops & custom manufacturing environment. Delta Dynamics Inc. Chakravorty, S., & Atwater, J. (2005). The impact of free goods on the performance of drum-buffer-rope scheduling systems. International Journal Of Production Economics, 95(3), 347-357. http://dx.doi.org/10.1016/j.ijpe.2004.01.001 Chakravorty, S., & Verhoeven, P. (1996). Learning the Theory of Constraints with a Simulation Game. Simulation & Gaming, 27(2), 223-237. http://dx.doi.org/10.1177/1046878196272006 Chang, Y., & Huang, W. (2013). An enhanced model for SDBR in a random reentrant flow shop environment. International Journal Of Production Research , 52(6), 1808-1826. http://dx.doi.org/10.1080/00207543.2013.848491 Cheraghi, H., Dadashzaddeh, M., & Soppin, M. (2008). Comparative analysis of production control systems through simulation. J. Of Business And Economics Research, 6(5), 87-104. Georgiadis, P., & Politou, A. (2013). Dynamic Drum-Buffer-Rope approach for production planning and control in capacitated flow-shop manufacturing systems. Computers & Industrial Engineering, 65(4), 689-703. http://dx.doi.org/10.1016/j.cie.2013.04.013 Goldratt, E. (1990). What is this thing called theory of constraints and how should it be implemented?. Great Barrington, Mass.: North River Press. Goldratt, E. (1997). Critical chain. Great Barrington, MA: North River Press. GOLDRATT, E. (1988). Computerized shop floor scheduling. International Journal Of Production Research, 26(3), 443-455. http://dx.doi.org/10.1080/00207548808947875 Goldratt, E., & Fox, R. (1986). The race. Croton-on-Hudson, NY: North River Press. Gupta, M., & Snyder, D. (2009). Comparing TOC with MRP and JIT: a literature review. International Journal Of Production Research , 47(13), 3705-3739. http://dx.doi.org/10.1080/00207540701636322 Lee, J., Chang, J., Tsai, C., & Li, R. (2010). Research on enhancement of TOC Simplified Drum-Buffer-Rope system using novel generic procedures. Expert Systems With Applications, 37(5), 3747-3754. http://dx.doi.org/10.1016/j.eswa.2009.11.049 Pegels, C., & Watrous, C. (2005). Application of the theory of constraints to a bottleneck operation in a manufacturing plant. Journal Of Manufacturing Technology Management, 16(3), 302-311. http://dx.doi.org/10.1108/17410380510583617 Rabbani, M., & Tanhaie, F. (2015). A Markov chain analysis of the effectiveness of drum-buffer-rope material flow management in job shop environment. 10.5267/J.Ijiec, 6(4), 457-468. http://dx.doi.org/10.5267/j.ijiec.2015.6.001 Rahman, S. (1998). Theory of constraints. Int Jrnl Of Op & Prod Mnagemnt, 18(4), 336-355. http://dx.doi.org/10.1108/01443579810199720 Rand, G. (2000). Critical chain: the theory of constraints applied to project management. International Journal Of Project Management, 18(3), 173-177. http://dx.doi.org/10.1016/s0263-7863(99)00019-8 Ray, A., Sarkar, B., & Sanyal, S. (2010). The TOC-Based Algorithm for Solving Multiple Constraint Resources. IEEE Transactions On Engineering Management, 57(2), 301-309. http://dx.doi.org/10.1109/tem.2009.2023140 Sale, M., & Inman, R. (2003). Survey-based comparison of performance and change in performance of firms using traditional manufacturing, JIT and TOC. International Journal Of Production Research, 41(4), 829-844. http://dx.doi.org/10.1080/0020754031000065520 Sarkar, B., & Kumar, S. (2008). Research: an improved theory of constraints. Int. J. Of Accounting And Information Management, 16, 155-165.
Scheragenheim, E., & Dettmer, W. (2000). Simplified drum buffer rope, a whole system approach to high velocity manufacturing. Lucie Press. Schheimrage, E., & Ronen, B. (1990). Drum buffer rope shop floor control. Production And Inventory Management Journal , 3, 18–22. Steele *, D., Philipoom, P., Malhotra, M., & Fry, T. (2005). Comparisons between drum–buffer–rope and material requirements planning: a case study. International Journal Of Production Research, 43(15), 3181-3208. http://dx.doi.org/10.1080/00207540500076704 Tanhaei, F., & Nahavandi, N. (2012). Algorithm for solving product mix problem in two-constraint resources environment. The International Journal Of Advanced Manufacturing Technology, 64(5-8), 1161-1167. http://dx.doi.org/10.1007/s00170-012-4054-y Wu, S., Morris, J., & Gordon, T. (1994). A simulation analysis of the effectiveness of drum-buffer-rope scheduling in furniture manufacturing. Computers & Industrial Engineering, 26(4), 757-764. http://dx.doi.org/10.1016/0360- 8352(94)90010-8 | ||
آمار تعداد مشاهده مقاله: 819 تعداد دریافت فایل اصل مقاله: 644 |