سامانه مدیریت نشریات علمی دانشگاه شاهد

Mousavi, S. Meysam, Mohagheghi, V., Vahdani, B.. (1394). A New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets. , 1(2), 57-70. doi: 10.22070/jqepo.2015.335
S. Meysam Mousavi; V. Mohagheghi; B. Vahdani. "A New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets". , 1, 2, 1394, 57-70. doi: 10.22070/jqepo.2015.335
Mousavi, S. Meysam, Mohagheghi, V., Vahdani, B.. (1394). 'A New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets', , 1(2), pp. 57-70. doi: 10.22070/jqepo.2015.335
Mousavi, S. Meysam, Mohagheghi, V., Vahdani, B.. A New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets. , 1394; 1(2): 57-70. doi: 10.22070/jqepo.2015.335