Birjandi, A., Mousavi, S. Meysam, Hajirezaie, M., Vahdani, Behnam. (1398). Optimizing and Solving Project Scheduling Problem for Flexible Networks with Multiple Routes in Production Environments. , 4(1), 175-196. doi: 10.22070/jqepo.2019.3870.1091
A. Birjandi; S. Meysam Mousavi; M. Hajirezaie; Behnam Vahdani. "Optimizing and Solving Project Scheduling Problem for Flexible Networks with Multiple Routes in Production Environments". , 4, 1, 1398, 175-196. doi: 10.22070/jqepo.2019.3870.1091
Birjandi, A., Mousavi, S. Meysam, Hajirezaie, M., Vahdani, Behnam. (1398). 'Optimizing and Solving Project Scheduling Problem for Flexible Networks with Multiple Routes in Production Environments', , 4(1), pp. 175-196. doi: 10.22070/jqepo.2019.3870.1091
Birjandi, A., Mousavi, S. Meysam, Hajirezaie, M., Vahdani, Behnam. Optimizing and Solving Project Scheduling Problem for Flexible Networks with Multiple Routes in Production Environments. , 1398; 4(1): 175-196. doi: 10.22070/jqepo.2019.3870.1091
آمار
تعداد نشریات18
تعداد شماره‌ها485
تعداد مقالات4,767
تعداد مشاهده مقاله6,209,874
تعداد دریافت فایل اصل مقاله5,067,478