سامانه مدیریت نشریات علمی دانشگاه شاهد

Birjandi, A., Mousavi, S. Meysam, Hajirezaie, M., Vahdani, Behnam. (1398). Optimizing and Solving Project Scheduling Problem for Flexible Networks with Multiple Routes in Production Environments. , 4(1), 175-196. doi: 10.22070/jqepo.2019.3870.1091
A. Birjandi; S. Meysam Mousavi; M. Hajirezaie; Behnam Vahdani. "Optimizing and Solving Project Scheduling Problem for Flexible Networks with Multiple Routes in Production Environments". , 4, 1, 1398, 175-196. doi: 10.22070/jqepo.2019.3870.1091
Birjandi, A., Mousavi, S. Meysam, Hajirezaie, M., Vahdani, Behnam. (1398). 'Optimizing and Solving Project Scheduling Problem for Flexible Networks with Multiple Routes in Production Environments', , 4(1), pp. 175-196. doi: 10.22070/jqepo.2019.3870.1091
Birjandi, A., Mousavi, S. Meysam, Hajirezaie, M., Vahdani, Behnam. Optimizing and Solving Project Scheduling Problem for Flexible Networks with Multiple Routes in Production Environments. , 1398; 4(1): 175-196. doi: 10.22070/jqepo.2019.3870.1091